FAST - TRACK EXECUTION

In many regions of the world, the absence of reliable sources of electricity generation significantly affects economic development.

METKA has extensive references and a strong record of successfully delivering major plant projects, often on very demanding fast-track project schedules, to support governments, local communities and industrial customers across several countries.

Using state-of-the-art technology, METKA provides a broad range of complete, specialized and cost effective, fast-track power solutions. These rapid, turn-key solutions are utilized to cover different types of needs or applications, such as:

  • Increased consumption of electricity due to seasonal demand
  • Power for remote areas where connection to the distribution grid is not possible or impractical
  • Industrial and mining facilities that require constant power to ensure maximum operational capacity

METKA’s customized, fast-track power solutions encompass both mobile/temporary and permanent options, in order to serve the different power needs in the most efficient way:

  • Experience in permanent installations  
  • Experience in smaller mobile units   

References

2 gas turbine units TURBOMACH TITAN 130, Greece (Fast Track)

Greece

10 mobile gas turbine power generating sets, Ghana (Fast Track)

Ghana

8 mobile gas turbine power generating sets, Algeria (Fast Track)

Algeria

24 mobile gas turbine power generating sets, (Fast Track)

Algeria

Simple Cycle Project of 146 MW, Zarqa (Fast Track)

Jordan

6 mobile gas turbine power generating sets, Algeria (Fast Track)

Algeria

Chania & Linoperamata Crete, Soroni Rhodos - diesel oil fired GT 3x28 MW

Greece

SES Linoperamata, Unit LM 6000 PC sprint of 43,3 MW, diesel oil fired GT

Greece

Temporary and back up power generation for Athens 2004 Olympic Games

Greece

LPG Power Plant οf 200MW, Ghana (Fast-Track)

Ghana

home sitemap contact accessibility