ENERGY PROJECTS

10 mobile gas turbine power generating sets, Ghana (Fast Track)

Ghana

PROJECTS

Description

The project concerns the engineering, procurement, installation, commissioning and operation & maintenance of 10 General Electric TM2500+ mobile gas turbine power generating sets, including trailer mounted balance of plant equipment, with a total output of 256 MW at ISO conditions, to be installed in Takoradi, Ghana.

The contract is carried out by Power Projects Limited, the fully owned subsidiary of METKA Group.

Download in PDF
Project Summary

Customer

Ameri Energy / Government of Ghana

Location

Ghana

Sector

Energy Projects

Category

Gas Turbines / Combined Cycle

Start

2015

Status

Complete