ENERGY PROJECTS

Combined Cycle Power Plant of 192MW, Takoradi

Ghana

PROJECTS

Description

The scope of the project includes the engineering, procurement, construction and commissioning of a 192MW combined cycle power plant in Takoradi.  The plant will be implemented with the capability to operate on both natural gas and light crude oil, and will utilize the latest advanced version of General Electric’s well proven 9E gas turbine. 

The project will be executed by METKA in consortium with General Electric.

Download in PDF
Project Summary

Customer

Amandi Energy Limited

Location

Ghana

Sector

Energy Projects

Category

Gas Turbines / Combined Cycle

Start

2016

Status

In Progress