ENERGY PROJECTS

Combined Cycle Power Plant of 701 MW, Deir Ali-Damascus

Syria

PROJECTS

Description

Complete combined cycle power plant on turn-key basis working on natural gas (main fuel) and distillate oil (back-up fuel), and consisting of three sections:

Section 1: first open cycle gas turbine (OCGT) unit with capacity of 279MW at ISO conditions (complete, in operation)

Section 2: second open cycle gas turbine (OCGT) unit with capacity of 279MW at ISO conditions (complete, in operation)

Section 3: completion of the combined cycle plant with total net capacity 701MW at site conditions (in progress)

The scope of the project includes operations and maintenance responsibility for the plant.

• Contractor: Consortium METKA - ANSALDO Energia, with METKA as leader

Download in PDF
Project Summary

Customer

Public Establishment of Electricity for Generation (PEEG)

Location

Syria

Sector

Energy Projects

Category

Gas Turbines / Combined Cycle

Start

2009

Status

Complete

home sitemap contact accessibility