Engineering, design, procurement, installation and commissioning of an open cycle power plant of 1250 MW. The power station consists of 10 GE triple fuel gas turbines (supplied by the Iraqi Ministry of Electricity), in order to operate with heavy fuel oil (HFO), natural gas or light distillate oil (LDO).